Briefing on De Los Santos

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

De Los Santos is a 201 MW Battery project in Texas, currently active.

BRP De Los Santos BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.

Queue ID
ERCOT-24INR0142
Location
Maverick, Texas
Technology
Battery
Developer
BRP De Los Santos BESS LLC
Market / region
ERCOT
Point of interconnection
78016 Sunglow Substation 138kV

What stands out

1

De Los Santos is a 201 MW Battery project in Texas with status active.

2

BRP De Los Santos BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-01.

4

Latest linked story: “With No Permanent Home For Spent Plutonium, Amarillo’s Pantex Plant Continues To Play Host” (Texas Standard, 2018-04-24).

Market and operating context

Queue date
2022-05-10
Proposed COD
2027-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

De Los Santos — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0142
LocationMaverick, Texas
TechnologyBattery
DeveloperBRP De Los Santos BESS LLC
Market / regionERCOT
Point of interconnection78016 Sunglow Substation 138kV
Queue date2022-05-10
Proposed COD2027-12-01