Dart Energy Storage A1 is a 50 MW Battery project in Texas, currently active.
Dart Energy Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-11-30.
- Queue ID
- ERCOT-28INR0293
- Location
- Taylor, Texas
- Technology
- Battery
- Developer
- Dart Energy Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- TAP138KV #6290 ABILENE MAPLE STREET - #6275 ABILENE EAST
What stands out
1
Dart Energy Storage A1 is a 50 MW Battery project in Texas with status active.
2
Dart Energy Storage LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-11-30.
Market and operating context
- Queue date
- 2025-02-25
- Proposed COD
- 2028-11-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.