Briefing on Darkwood BESS

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
151 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Darkwood BESS is a 151 MW Solar+Battery project in Texas, currently active.

Mustang Creek Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.

Queue ID
ERCOT-27INR0050
Location
Comanche, Texas
Technology
Solar+Battery
Developer
Mustang Creek Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345KV 1900 Comanche Peak - 1440 Comanche Switch

What stands out

1

Darkwood BESS is a 151 MW Solar+Battery project in Texas with status active.

2

Mustang Creek Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-01.

Market and operating context

Queue date
2023-06-07
Proposed COD
2028-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Darkwood BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0050
LocationComanche, Texas
TechnologySolar+Battery
DeveloperMustang Creek Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345KV 1900 Comanche Peak - 1440 Comanche Switch
Queue date2023-06-07
Proposed COD2028-07-01