Query
Cuero BESS
Type
Entity Briefing
Entity
Cuero BESS
State
TN
Technology
battery
Generated
2026-10-11T03:28:14.001Z

Briefing on Cuero BESS

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
10 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-05-31
Proposed COD
In Progress (unknown study)
Queue phase
Briefing/projectactive

Cuero BESS is a 10 MW Battery project in ERCOT, currently active.

CUERO BESS, LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2026-05-31.

Queue ID
ERCOT-25INR0675
Technology
Battery
Developer
CUERO BESS, LLC
Market / region
ERCOT
Point of interconnection
500 kVA, 12.47Y/7.2-0.48Y/0.277kV, 3PH, 60Hz, Z=5.75%, Liquid Filled Type, Type 3R Outdoor_x000D_ • Station Name: CUERO LCRA_x000D_ • Station Code: CUERO_x000D_ • BUS #: 7244_x000D_ • Transmission Level Voltage: 138 kV_x000D_ • Load/Load Transformer: Cuero T4_x000D_

What stands out

1

Cuero BESS is a 10 MW Battery project with status active.

2

CUERO BESS, LLC is the reported developer.

3

The reported queue phase is In Progress (unknown study); proposed COD is 2026-05-31.

Market and operating context

Queue date
2024-05-22
Proposed COD
2026-05-31
IA status
In Progress (unknown study)
Study phase
In Progress (unknown study)

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cuero BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0675
TechnologyBattery
DeveloperCUERO BESS, LLC
Market / regionERCOT
Point of interconnection500 kVA, 12.47Y/7.2-0.48Y/0.277kV, 3PH, 60Hz, Z=5.75%, Liquid Filled Type, Type 3R Outdoor_x000D_ • Station Name: CUERO LCRA_x000D_ • Station Code: CUERO_x000D_ • BUS #: 7244_x000D_ • Transmission Level Voltage: 138 kV_x000D_ • Load/Load Transformer: Cuero T4_x000D_
Queue date2024-05-22
Proposed COD2026-05-31
IA statusIn Progress (unknown study)