Briefing/projectactive
Cuero BESS is a 10 MW Battery project in ERCOT, currently active.
CUERO BESS, LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2026-05-31.
- Queue ID
- ERCOT-25INR0675
- Technology
- Battery
- Developer
- CUERO BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- 500 kVA, 12.47Y/7.2-0.48Y/0.277kV, 3PH, 60Hz, Z=5.75%, Liquid Filled Type, Type 3R Outdoor_x000D_ • Station Name: CUERO LCRA_x000D_ • Station Code: CUERO_x000D_ • BUS #: 7244_x000D_ • Transmission Level Voltage: 138 kV_x000D_ • Load/Load Transformer: Cuero T4_x000D_
What stands out
1
Cuero BESS is a 10 MW Battery project with status active.
2
CUERO BESS, LLC is the reported developer.
3
The reported queue phase is In Progress (unknown study); proposed COD is 2026-05-31.
Market and operating context
- Queue date
- 2024-05-22
- Proposed COD
- 2026-05-31
- IA status
- In Progress (unknown study)
- Study phase
- In Progress (unknown study)
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.