HARQUAHALA FLATS 2 is a 822 MW Solar+Battery project in Arizona, currently active.
The reported queue phase is C14. Proposed COD is 2028-04-15.
- Queue ID
- CAISO-2027
- Location
- Maricopa, Arizona
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Delaney Substation 500 kV
What stands out
1
HARQUAHALA FLATS 2 is a 822 MW Solar+Battery project in Arizona with status active.
2
The reported queue phase is C14; proposed COD is 2028-04-15.
3
Latest linked story: “Utah solar developer taps area near Phoenix for $1.2B project; water negotiations underway” (The Business Journals, 2024-04-11).
Market and operating context
- Queue date
- 2021-04-15
- Proposed COD
- 2028-04-15
- IA status
- System Impact Study
- Study phase
- C14
- Service type
- NRIS
Why it matters