Briefing on HARQUAHALA FLATS 2

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
822 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2028-04-15
Proposed COD
C14
Queue phase
Briefing/projectactive

HARQUAHALA FLATS 2 is a 822 MW Solar+Battery project in Arizona, currently active.

The reported queue phase is C14. Proposed COD is 2028-04-15.

Queue ID
CAISO-2027
Location
Maricopa, Arizona
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Delaney Substation 500 kV

What stands out

1

HARQUAHALA FLATS 2 is a 822 MW Solar+Battery project in Arizona with status active.

2

The reported queue phase is C14; proposed COD is 2028-04-15.

3

Latest linked story: “Utah solar developer taps area near Phoenix for $1.2B project; water negotiations underway” (The Business Journals, 2024-04-11).

Market and operating context

Queue date
2021-04-15
Proposed COD
2028-04-15
IA status
System Impact Study
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

HARQUAHALA FLATS 2 — verified asset snapshot

FieldValue
Queue IDCAISO-2027
LocationMaricopa, Arizona
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionDelaney Substation 500 kV
Queue date2021-04-15
Proposed COD2028-04-15
IA statusSystem Impact Study