HARQUAHALA FLATS 2 (CAISO-2027) — Project Summary

Queue ID
CAISO-2027
Capacity
821.52 MW
Technology
Solar+Battery
Status
active
Location
Maricopa, AZ
Region
CAISO
Developer
—
IA Status
System Impact Study

HARQUAHALA FLATS 2

CAISO-2027BetaActiveSolarBatteryCAISOLBNL + Live

821.52 MW hybrid in Maricopa, AZ · In queue since April 2021 · Proposed COD April 2028

BA: AZPSISO/RTO: CAISONERC: WECCRC: SPPW

821.52 MW

Capacity

2

Components

Solar + Battery

5y 7m

In Queue

System Impact Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7 years

Study Phase

C14

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

Active sheet; C14

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-15

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2027
Differs from queue: Apr 15, 2028
Developer in saved assessment
Copia Power
Status at research time
Active
Active in the CAISO queue at System Impact Study stage with no IA executed; APS lists it among its BESS PPAs with a 2027 date.
Financing
In progress
Business Journals (Apr 2024) reported a $1.2B solar project in Harquahala Valley with Carlyle named as lender/backer. Financial close and the link to this specific queue entry are not confirmed.

Milestones in this assessment

COD target2027Latest in this assessment

APS 10-K lists Harquahala Flats 2 (Tonopah, AZ) in its BESS PPA table with a 2027 date.

s22.q4cdn.com
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. s22.q4cdn.com/464697698/files/doc_financials/2025/ar/PNW-10-K.pdf
  2. bizjournals.com/phoenix/news/2024/04/11/solar-developer-phoenix-energy-project.html
  3. interconnection.fyi/project/caiso-2027

Commercial operation date: APS's FY2025 10-K (filed Feb 2026) lists Harquahala Flats 2 (Tonopah, AZ) in its BESS PPA table with a 2027 date, about a year ahead of the LBNL proposed COD of 2028-04-15. This is a single post-LBNL signal and the snippet is truncated, so the 2027 date is likely but not firmly confirmed.

Developer: LBNL lists no developer. The only attribution is a single April 2024 Business Journals article, via news extraction, naming Copia Power (Carlyle-backed) for a $1.2B Harquahala Valley solar project. The snippet does not name Harquahala Flats 2 explicitly, so the link is probable but unconfirmed.

Status: LBNL and interconnection.fyi both show the project as active, and the news extraction says it is not operational. No withdrawal or construction signal was found.

Project lifecycle
as of 2024-04-11
OperationalNoThe Business Journals · 2024-04-11
TechnologySolarThe Business Journals · 2024-04-11
DeveloperCopia PowerThe Business Journals · 2024-04-11

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Harquahala Flats 2 project is a proposed 821.52 MW hybrid solar and battery energy storage project located in Maricopa County, Arizona. The development project consists of 410.76 MW of solar photovoltaic generation paired with 410.76 MW of battery energy storage. The project, developed by DCRT, is currently active in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-2027, with an interconnection queue entry date of April 15, 2021.

The proposed commercial operation date for Harquahala Flats 2 is April 15, 2028. The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Delaney Substation 500 kV. The project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AZ

County

Maricopa

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

DCRT

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Delaney Substation 500 kV

Data Source

LBNL + Live

DeveloperCopia PowerThe Business Journals · 2024-04-11
TransactionProject financingThe Business Journals · 2024-04-11
Deal value$1.2BThe Business Journals · 2024-04-11
LenderCarlyleThe Business Journals · 2024-04-11
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar410.76 MW · 50%
Battery410.76 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.