Crowded Star Solar II is a 190 MW Solar+Battery project in Texas, currently active.
Jones City Solar II, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-08-21.
- Queue ID
- ERCOT-22INR0274
- Location
- Jones, Texas
- Technology
- Solar+Battery
- Developer
- Jones City Solar II, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)
What stands out
Crowded Star Solar II is a 190 MW Solar+Battery project in Texas with status active.
Jones City Solar II, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-08-21.
Latest linked story: “Texas is ground zero for a robot revolution in solar panel installations” (Dallas News, 2025-05-01).
Market and operating context
- Queue date
- 2020-03-26
- Proposed COD
- 2026-08-21
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.