Briefing/projectactive
Crater BESS is a 302 MW Battery project in Texas, currently active.
BRP Crater BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-05-01.
- Queue ID
- ERCOT-22INR0347
- Location
- Howard, Texas
- Technology
- Battery
- Developer
- BRP Crater BESS LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV Rockhound Switch (10062) – Prong Moss Switch (10057) ckt 1
What stands out
1
Crater BESS is a 302 MW Battery project in Texas with status active.
2
BRP Crater BESS LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-05-01.
4
Latest linked story: “Japan's Kyuden invests in Texas battery projects of Spearmint” (Renewables Now, 2026-01-07).
Market and operating context
- Queue date
- 2020-05-20
- Proposed COD
- 2029-05-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.