Crater BESS
301.5 MW storage in Howard, TX · In queue since May 2020 · Proposed COD May 2029
301.5 MW
Capacity
1
Components
Battery
6y 6m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
9 years
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-05-01
Projected COD moved
5 times
Nov 2022 → May 2029
Net change
+78 months
first report to latest
Capacity
304 → 310 MW
changed in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
low confidence at research time
- echanges.dila.gouv.fr/OPENDATA/AMF/ECO/2026/02/FCECO081063_20260226.pdf
- app.nrgmap.com/queues/ercot-22inr0347
- interconnection.fyi/project/ercot-22inr0347
- cleanview.co/power-projects/planned/battery-storage-projects/texas/22INR0347/crater-bess
- interxdata.com/projects/crater-bess-ercot-gis-report-22inr0347/
- renewablesnow.com/news/japans-kyuden-invests-in-texas-battery-projects-of-spearmint-1287618/
Commercial operation date: The only COD signal is the LBNL/ERCOT proposed date of 2029-05-01. Cleanview's 'expected to come online in May 2029' appears to be derived from the same queue data, so it is not independent. No developer press release or financing-backed target was found.
Developer: ENGIE's Feb 2026 AMF subsidiary filing lists BRP Crater BESS LLC as a 100% fully consolidated subsidiary, and the 'BRP' prefix points to Broad Reach Power. The news-extracted 'Spearmint Energy' (Kyuden financing article) is not tied to Crater BESS by any source and conflicts with the BRP/ENGIE ownership, so I discounted it.
Status: LBNL, interconnection.fyi and NRG Map (status active as of Sept 2026) all show the project as active in the queue. Only interXdata says 'operational', and that is inconsistent with the Facility Study stage and the 2029 proposed COD.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Crater BESS is a proposed 301.17 MW battery storage project located in Howard County, Texas. The project, developed by BRP Crater BESS LLC, is interconnected within the ERCOT region under queue ID ERCOT-22INR0347. It entered the interconnection queue on May 20, 2020, with a proposed commercial operation date of March 1, 2028. The project's interconnection status is currently in the Facility Study phase.
The Crater BESS project has been the subject of recent news coverage, appearing in approximately 50 news articles primarily focused on industry developments and deals.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Howard
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRP Crater BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV Rockhound Switch (10062) – Prong Moss Switch (10057) ckt 1
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- 1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-19
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.