Crater BESS (ERCOT-22INR0347) — Project Summary

Queue ID
ERCOT-22INR0347
Capacity
301.5 MW
Technology
Battery
Status
active
Location
Howard, TX
Region
ERCOT
Developer
BRP Crater BESS LLC
IA Status
Facility Study

Crater BESS

ERCOT-22INR0347BetaActiveBatteryERCOTLBNL + Live

301.5 MW storage in Howard, TX · In queue since May 2020 · Proposed COD May 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

301.5 MW

Capacity

1

Components

Battery

6y 6m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

9 years

Facilities Study50%
Queue EntryMay 20, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-01

Queue history
22INR0347 · 77 monthly ERCOT reports, May 2020 – Sep 2026

Projected COD moved

5 times

Nov 2022 → May 2029

Net change

+78 months

first report to latest

Capacity

304 → 310 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 20, 2020
Facilities study approvedMay 26, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 1, 2029
From queue filing
Developer in saved assessment
ENGIE North America (Broad Reach Power)
Filed as BRP Crater BESS LLC
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. No construction or financing signal found. interXdata's 'operational' label contradicts ERCOT, LBNL and NRG Map, and looks like a normalization error.
Financing
Not recorded
Research sources and reasoning (6 recorded sources)

low confidence at research time

  1. echanges.dila.gouv.fr/OPENDATA/AMF/ECO/2026/02/FCECO081063_20260226.pdf
  2. app.nrgmap.com/queues/ercot-22inr0347
  3. interconnection.fyi/project/ercot-22inr0347
  4. cleanview.co/power-projects/planned/battery-storage-projects/texas/22INR0347/crater-bess
  5. interxdata.com/projects/crater-bess-ercot-gis-report-22inr0347/
  6. renewablesnow.com/news/japans-kyuden-invests-in-texas-battery-projects-of-spearmint-1287618/

Commercial operation date: The only COD signal is the LBNL/ERCOT proposed date of 2029-05-01. Cleanview's 'expected to come online in May 2029' appears to be derived from the same queue data, so it is not independent. No developer press release or financing-backed target was found.

Developer: ENGIE's Feb 2026 AMF subsidiary filing lists BRP Crater BESS LLC as a 100% fully consolidated subsidiary, and the 'BRP' prefix points to Broad Reach Power. The news-extracted 'Spearmint Energy' (Kyuden financing article) is not tied to Crater BESS by any source and conflicts with the BRP/ENGIE ownership, so I discounted it.

Status: LBNL, interconnection.fyi and NRG Map (status active as of Sept 2026) all show the project as active in the queue. Only interXdata says 'operational', and that is inconsistent with the Facility Study stage and the 2029 proposed COD.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Crater BESS is a proposed 301.17 MW battery storage project located in Howard County, Texas. The project, developed by BRP Crater BESS LLC, is interconnected within the ERCOT region under queue ID ERCOT-22INR0347. It entered the interconnection queue on May 20, 2020, with a proposed commercial operation date of March 1, 2028. The project's interconnection status is currently in the Facility Study phase.

The Crater BESS project has been the subject of recent news coverage, appearing in approximately 50 news articles primarily focused on industry developments and deals.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Howard

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP Crater BESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV Rockhound Switch (10062) – Prong Moss Switch (10057) ckt 1

Data Source

LBNL + Live

DeveloperSpearmint EnergyRenewables Now · 2026-01-07
TransactionProject financing±Renewables Now · 2026-01-07
OfftakerCaptonaRenewables Now · 2024-05-02
LenderKyudenRenewables Now · 2026-01-07
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-04-19

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.