Briefing/projectactive
Copperleaf Energy Storage is a 307 MW Battery project in Texas, currently active.
Copperleaf Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-18.
- Queue ID
- ERCOT-28INR0118
- Location
- Wichita, Texas
- Technology
- Battery
- Developer
- Copperleaf Energy Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV Fisher Road Switch (#1425) – Riley (#6101)
What stands out
1
Copperleaf Energy Storage is a 307 MW Battery project in Texas with status active.
2
Copperleaf Energy Storage, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-04-18.
Market and operating context
- Queue date
- 2024-11-19
- Proposed COD
- 2029-04-18
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.