Compton BESS is a 10 MW Battery project in ERCOT, currently active.
SMT Dallas VII LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2027-04-08.
- Queue ID
- ERCOT-25INR0699
- Technology
- Battery
- Developer
- SMT Dallas VII LLC
- Market / region
- ERCOT
- Point of interconnection
- POIB 2981 ERCOT Bus name COMPTON1_8 ERCOT load name LDLXFMR1 Oncor XFMR number 1
What stands out
1
Compton BESS is a 10 MW Battery project with status active.
2
SMT Dallas VII LLC is the reported developer.
3
The reported queue phase is In Progress (unknown study); proposed COD is 2027-04-08.
Market and operating context
- Queue date
- 2024-08-29
- Proposed COD
- 2027-04-08
- IA status
- In Progress (unknown study)
- Study phase
- In Progress (unknown study)
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.