Complex Serenity Wind is a 971 MW Wind project in Texas, currently active.
Serenity Wind, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-16.
- Queue ID
- ERCOT-28INR0215
- Location
- Armstrong, Texas
- Technology
- Wind
- Developer
- Serenity Wind, LLC
- Market / region
- ERCOT
- Point of interconnection
- Double tap 345 kV Alibates (bus# 23900) to Tule Canyon (bus# 23914) and the Alibates (bus# 23900) to Midpoint Switch (bus# 23931)
What stands out
1
Complex Serenity Wind is a 971 MW Wind project in Texas with status active.
2
Serenity Wind, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-04-16.
Market and operating context
- Queue date
- 2025-06-05
- Proposed COD
- 2029-04-16
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.