Briefing/projectactive
Commodus 2 Solar is a 502 MW Solar project in Texas, currently active.
IP Blackwell II, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-30.
- Queue ID
- ERCOT-29INR0032
- Location
- Swisher, Texas
- Technology
- Solar
- Developer
- IP Blackwell II, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)
What stands out
1
Commodus 2 Solar is a 502 MW Solar project in Texas with status active.
2
IP Blackwell II, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-07-30.
Market and operating context
- Queue date
- 2025-03-03
- Proposed COD
- 2029-07-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.