Briefing on Comanche BESS

Entity Briefing
Generated Sep 19, 2026·Dataset freshness not reported
614 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-10-11
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Comanche BESS is a 614 MW Battery project in Texas, currently active.

ENERGOS BESS is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-11.

Queue ID
ERCOT-27INR0365
Location
Comanche, Texas
Technology
Battery
Developer
ENERGOS BESS
Market / region
ERCOT
Point of interconnection
#1440 Comanche Switching Station 345kV

What stands out

1

Comanche BESS is a 614 MW Battery project in Texas with status active.

2

ENERGOS BESS is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-10-11.

Market and operating context

Queue date
2024-12-06
Proposed COD
2028-10-11
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Comanche BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0365
LocationComanche, Texas
TechnologyBattery
DeveloperENERGOS BESS
Market / regionERCOT
Point of interconnection#1440 Comanche Switching Station 345kV
Queue date2024-12-06
Proposed COD2028-10-11