Clear Fork Creek Solar and BESS SLF is a 1.2 GW Batteries asset in ERCOT (Texas), currently Under construction.
Clear Fork Creek Solar and BESS SLF is reported in Texas under Clear Fork. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Wilson, Texas
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Clear Fork
- Operator
- Clear Fork
- Grid
- ERCOT (Texas)
- Plant ID
- 65842
What stands out
Clear Fork Creek Solar and BESS SLF is a 1.2 GW Batteries asset in Texas with status Under construction.
Available financial measures include $1361/kW CapEx.
Latest linked story: “Enbridge Powers Meta Data Centers with $900M Texas Solar Investment” (CarbonCredits.com, 2025-07-24).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #1 of 344
- National rank
- #5 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.