1200 MW Batteries (600 MW) + Solar Photovoltaic (600 MW) planned in Wilson, TX
1,200 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clear Fork | Solar Proponent | — |
| Owner(s) | Clear Fork | Solar Proponent LLC | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Solar Proponent LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Clear Fork Creek Solar and BESS SLF is a 1,200 MW hybrid power plant located in Wilson County, Texas. The plant is owned and operated by Clear Fork. It utilizes both solar photovoltaic technology and battery energy storage systems. The primary fuel type is electricity (MWH). The plant consists of 2 generators.
The facility operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, falling under the Texas Reliability Entity (TRE) NERC region. Clear Fork Creek Solar and BESS SLF is ranked as the 3rd largest power plant out of 224 in Texas, and 7th nationally out of 514. The solar component of the plant uses a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $1.6B
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
Plant coordinates only
Last updated 2026-03-26
View all articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the InfraSure database.