Briefing on Cielo Vista Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
311 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-06-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cielo Vista Storage is a 311 MW Solar+Battery project in Texas, currently active.

Cielo Vista Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-30.

Queue ID
ERCOT-29INR0115
Location
Duval, Texas
Technology
Solar+Battery
Developer
Cielo Vista Storage, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1

What stands out

1

Cielo Vista Storage is a 311 MW Solar+Battery project in Texas with status active.

2

Cielo Vista Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-30.

Market and operating context

Queue date
2025-04-21
Proposed COD
2028-06-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cielo Vista Storage — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0115
LocationDuval, Texas
TechnologySolar+Battery
DeveloperCielo Vista Storage, LLC
Market / regionERCOT
Point of interconnectionTap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1
Queue date2025-04-21