Cider Solar is a 500 MW Solar project in New York, currently active.
Hecate Energy Cider Solar LLC is the reported developer. The reported queue phase is System Impact Study. Proposed COD is 2027-01-01.
- Queue ID
- NYISO-811
- Location
- Genesee, New York
- Technology
- Solar
- Developer
- Hecate Energy Cider Solar LLC
- Market / region
- NYISO
- Point of interconnection
- Dysinger - New Rochester 345kV
What stands out
Cider Solar is a 500 MW Solar project in New York with status active.
Hecate Energy Cider Solar LLC is the reported developer.
The reported queue phase is System Impact Study; proposed COD is 2027-01-01.
Latest linked story: “Energy Transition Update - Cider Solar Project Advances New York's Renewable Energy Future” (Yahoo Finance, 2026-02-28).
Market and operating context
- Queue date
- 2019-04-03
- Proposed COD
- 2027-01-01
- IA status
- System Impact Study
- Study phase
- System Impact Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.