Query
Chevelon Butte Phase 2
Type
Entity Briefing
Entity
Chevelon Butte Phase 2
Generated
2026-10-18T02:33:02.029Z

Briefing on Chevelon Butte Phase 2

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
216 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
27.8%
Capacity factor
525 GWh
Annual generation
Briefing/plantOperating

Chevelon Butte Phase 2 is a 216 MW Onshore Wind Turbine asset in Arizona, currently Operating.

Chevelon Butte Phase 2 is reported in Arizona since 2024 under AES. Available operating and financial measures include 27.8% capacity factor and 525 GWh annual generation; $2114/kW reported CapEx.

Location
Coconino, Arizona
Technology
Onshore Wind Turbine
Owner / parent
AES
Operator
AES Clean Energy
Grid
Arizona Public Service Company
Plant ID
67176

What stands out

1

Chevelon Butte Phase 2 is a 216 MW Onshore Wind Turbine asset in Arizona with status Operating.

2

Latest annual operating measures report 27.8% capacity factor and 525 GWh annual generation.

3

Available financial measures include $2114/kW CapEx.

4

Latest linked story: “Clean energy and cattle: Wind farm begins operation on historic Winslow ranch” (The Arizona Republic, 2023-07-13).

Market and operating context

Balancing authority
Arizona Public Service Company
NERC region
WECC
State rank
#4 of 9
National rank
#236 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.