Search plants, projects, owners, and states
216 MW Wind operating in Coconino, AZ
216 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2024
Operating Since
Coordinates
34.6821, -110.8030
County
Coconino, AZ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | AES Corp | — |
| Owner(s) | AES Clean Energy | AES | — |
| Status | Operating | operating | — |
Chevelon Butte Phase 2 is a 216 MW wind power plant located in Coconino County, Arizona. The facility began operating in 2024 and is owned and operated by AES Clean Energy, a subsidiary of AES. The plant utilizes one generator consisting of multiple onshore wind turbines. The wind turbines are manufactured by Vestas, model V150-4.5, with a rotor diameter of 150 meters and a hub height of 120 meters.
In its most recent year of operation, Chevelon Butte Phase 2 generated 525,472 MWh of electricity, resulting in a capacity factor of 27.8%. The plant is interconnected to the grid within the Arizona Public Service Company balancing authority, operating within the Western Electricity Coordinating Council (WECC) NERC region. Chevelon Butte Phase 2 is currently ranked as the third largest of four wind plants in Arizona, and 224th out of 734 wind plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Arizona Public Service Company (AZPS)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
28.8K MWh
Latest Month
525.5K MWh
Annual Generation
27.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$2,114/kW
Est. Construction Cost
Total estimated cost: $456.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Chevelon Butte Phase 2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.