Chariot Storage is a 50 MW Battery project in Texas, currently active.
Chariot Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-02-29.
- Queue ID
- ERCOT-21INR0260
- Location
- Limestone, Texas
- Technology
- Battery
- Developer
- Chariot Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 69kV 99 Ben Hur - 107 Prairie Hill
What stands out
Chariot Storage is a 50 MW Battery project in Texas with status active.
Chariot Storage LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-02-29.
Latest linked story: “South Korea's Hanwha to buy Permian Basin power plant through Houston subsidiary” (The Business Journals, 2026-03-26).
Market and operating context
- Queue date
- 2019-03-06
- Proposed COD
- 2028-02-29
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.