Briefing/projectactive
Champs Elysees BESS is a 256 MW Battery project in Texas, currently active.
Champs Elysees Renewables, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-15.
- Queue ID
- ERCOT-27INR0216
- Location
- Milam, Texas
- Technology
- Battery
- Developer
- Champs Elysees Renewables, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 3377 Little Pond Switch - 3704 Hog Creek Switch
What stands out
1
Champs Elysees BESS is a 256 MW Battery project in Texas with status active.
2
Champs Elysees Renewables, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-15.
Market and operating context
- Queue date
- 2024-08-16
- Proposed COD
- 2027-12-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.