Briefing/projectactive
CH Solterra LLC is a 143 MW Solar project in Texas, currently active.
CH Solterra LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-31.
- Queue ID
- ERCOT-23INR0229
- Location
- Hopkins, Texas
- Technology
- Solar
- Developer
- CH Solterra LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 11796 White Oak POI - 11797 Brinker POI
What stands out
1
CH Solterra LLC is a 143 MW Solar project in Texas with status active.
2
CH Solterra LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2026-12-31.
Market and operating context
- Queue date
- 2021-03-19
- Proposed COD
- 2026-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.