Query
Castle Gap Solar Hybrid
Type
Entity Briefing
Entity
Castle Gap Solar Hybrid
Technology
solar
Generated
2026-10-10T14:18:31.435Z

Briefing on Castle Gap Solar Hybrid

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
190 MW
Capacity
Operating
Current status
2018
Operating since
2
Generators
23.1%
Capacity factor
384 GWh
Annual generation
Briefing/plantOperating

Castle Gap Solar Hybrid is a 190 MW Batteries asset in ERCOT (Texas), currently Operating.

Castle Gap Solar Hybrid is reported in Texas since 2018 under Vistra. Available operating and financial measures include 23.1% capacity factor and 384 GWh annual generation; $22.8/MWh reported energy value.

Location
Upton, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Vistra
Operator
Upton County Solar 2 LLC
Grid
ERCOT (Texas)
Plant ID
60123

What stands out

1

Castle Gap Solar Hybrid is a 190 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report 23.1% capacity factor and 384 GWh annual generation.

3

Available financial measures include $22.8/MWh energy value.

4

Latest linked story: “Vistra Progresses Clean-Energy Transition” (Industrial Info Resources, 2025-12-12).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#175 of 378
National rank
#448 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.