Query
Castle Gap Solar Hybrid
Type
Entity Briefing
Entity
Castle Gap Solar Hybrid
Technology
solar
Summary generated
Oct 10, 2026
First saved
Date not recorded

Briefing on Castle Gap Solar Hybrid

Entity Briefing

Summary generated Oct 10, 2026 (UTC).

Source dates used by this summary were not recorded.

190 MW
Capacity
Operating
Current status
2018
Operating since
2
Generators
23.1%
Capacity factor
384 GWh
Annual generation
Briefing/plantOperating

Castle Gap Solar Hybrid is a 190 MW Batteries asset in ERCOT (Texas), currently Operating.

Castle Gap Solar Hybrid is reported in Texas since 2018 under Vistra. Available operating and financial measures include 23.1% capacity factor and 384 GWh annual generation; $22.8/MWh reported energy value.

Location
Upton, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Vistra
Operator
Upton County Solar 2 LLC
Grid
ERCOT (Texas)
Plant ID
60123

What stands out

1

Castle Gap Solar Hybrid is a 190 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report 23.1% capacity factor and 384 GWh annual generation.

3

Available financial measures include $22.8/MWh energy value.

4

Latest linked story: “Vistra Progresses Clean-Energy Transition” (Industrial Info Resources, 2025-12-12).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#175 of 378
National rank
#448 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.