Briefing on Cartwheel BESS 2

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
157 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-06-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cartwheel BESS 2 is a 157 MW Battery project in Texas, currently active.

RWE Renewables is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-15.

Queue ID
ERCOT-23INR0495
Location
Hopkins, Texas
Technology
Battery
Developer
RWE Renewables
Market / region
ERCOT
Point of interconnection
Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch

What stands out

1

Cartwheel BESS 2 is a 157 MW Battery project in Texas with status active.

2

RWE Renewables is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-15.

Market and operating context

Queue date
2022-06-02
Proposed COD
2028-06-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cartwheel BESS 2 — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0495
LocationHopkins, Texas
TechnologyBattery
DeveloperRWE Renewables
Market / regionERCOT
Point of interconnectionTap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch
Queue date2022-06-02