Briefing/projectactive
Cartwheel BESS 1 is a 154 MW Battery project in Texas, currently active.
Cartwheel BESS, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-12-23.
- Queue ID
- ERCOT-23INR0494
- Location
- Hopkins, Texas
- Technology
- Battery
- Developer
- Cartwheel BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch
What stands out
1
Cartwheel BESS 1 is a 154 MW Battery project in Texas with status active.
2
Cartwheel BESS, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2025-12-23.
Market and operating context
- Queue date
- 2022-06-02
- Proposed COD
- 2025-12-23
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.