Briefing on Cartwheel BESS 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
154 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2025-12-23
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Cartwheel BESS 1 is a 154 MW Battery project in Texas, currently active.

Cartwheel BESS, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-12-23.

Queue ID
ERCOT-23INR0494
Location
Hopkins, Texas
Technology
Battery
Developer
Cartwheel BESS, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch

What stands out

1

Cartwheel BESS 1 is a 154 MW Battery project in Texas with status active.

2

Cartwheel BESS, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2025-12-23.

Market and operating context

Queue date
2022-06-02
Proposed COD
2025-12-23
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cartwheel BESS 1 — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0494
LocationHopkins, Texas
TechnologyBattery
DeveloperCartwheel BESS, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch
Queue date2022-06-02
Proposed COD2025-12-23