Query
Carrizo Springs BESS
Type
Entity Briefing
Entity
Carrizo Springs BESS
State
AZ
Technology
battery
Generated
2026-10-18T11:24:31.668Z

Briefing on Carrizo Springs BESS

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
10 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2025-12-03
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Carrizo Springs BESS is a 10 MW Battery project in Texas, currently active.

Regis Carrizo Springs is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-12-03.

Queue ID
ERCOT-25INR0592
Location
Dimmit, Texas
Technology
Battery
Developer
Regis Carrizo Springs
Market / region
ERCOT
Point of interconnection
Station Name: CARRIZO SPRINGS Station Code: CARIZZO Load/Load XFMR Name: LOAD1 PTI Bus Number: #8244 Voltage in kV (Transmission): 69 kV Distribution Voltage: 12.47 kV

What stands out

1

Carrizo Springs BESS is a 10 MW Battery project in Texas with status active.

2

Regis Carrizo Springs is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2025-12-03.

Market and operating context

Queue date
2024-08-22
Proposed COD
2025-12-03
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Carrizo Springs BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0592
LocationDimmit, Texas
TechnologyBattery
DeveloperRegis Carrizo Springs
Market / regionERCOT
Point of interconnectionStation Name: CARRIZO SPRINGS Station Code: CARIZZO Load/Load XFMR Name: LOAD1 PTI Bus Number: #8244 Voltage in kV (Transmission): 69 kV Distribution Voltage: 12.47 kV
Queue date2024-08-22
Proposed COD2025-12-03