Briefing on Cantaloupe Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
307 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-07-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Cantaloupe Solar is a 307 MW Solar project in Texas, currently active.

Saragosa Del Sol Energy, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-07-01.

Queue ID
ERCOT-23INR0116
Location
Reeves, Texas
Technology
Solar
Developer
Saragosa Del Sol Energy, LLC
Market / region
ERCOT
Point of interconnection
60716 Saragosa 138kV

What stands out

1

Cantaloupe Solar is a 307 MW Solar project in Texas with status active.

2

Saragosa Del Sol Energy, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-07-01.

4

Latest linked story: “RWE brings West of the Pecos solar project online” (RWE, 2023-02-02).

Market and operating context

Queue date
2020-12-22
Proposed COD
2028-07-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cantaloupe Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0116
LocationReeves, Texas
TechnologySolar
DeveloperSaragosa Del Sol Energy, LLC
Market / regionERCOT
Point of interconnection60716 Saragosa 138kV
Queue date2020-12-22
Proposed COD2028-07-01