Cantaloupe Solar is a 307 MW Solar project in Texas, currently active.
Saragosa Del Sol Energy, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-07-01.
- Queue ID
- ERCOT-23INR0116
- Location
- Reeves, Texas
- Technology
- Solar
- Developer
- Saragosa Del Sol Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- 60716 Saragosa 138kV
What stands out
1
Cantaloupe Solar is a 307 MW Solar project in Texas with status active.
2
Saragosa Del Sol Energy, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-07-01.
4
Latest linked story: “RWE brings West of the Pecos solar project online” (RWE, 2023-02-02).
Market and operating context
- Queue date
- 2020-12-22
- Proposed COD
- 2028-07-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.