Query
Camino Santiago Solar
Type
Entity Briefing
Entity
Camino Santiago Solar
Generated
2026-10-19T05:53:00.261Z

Briefing on Camino Santiago Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
196 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2027-02-18
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Camino Santiago Solar is a 196 MW Solar project in Texas, currently active.

Camino Solar Project, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-02-18.

Queue ID
ERCOT-22INR0605
Location
Milam, Texas
Technology
Solar
Developer
Camino Solar Project, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 3687 Bell County East Switch – 39950 TNP One Plant Ckt 2 (North Circuit).

What stands out

1

Camino Santiago Solar is a 196 MW Solar project in Texas with status active.

2

Camino Solar Project, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-02-18.

Market and operating context

Queue date
2022-09-02
Proposed COD
2027-02-18
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Camino Santiago Solar — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0605
LocationMilam, Texas
TechnologySolar
DeveloperCamino Solar Project, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 3687 Bell County East Switch – 39950 TNP One Plant Ckt 2 (North Circuit).
Queue date2022-09-02
Proposed COD2027-02-18