Query
CALYPSO SOLAR
Type
Entity Briefing
Entity
CALYPSO SOLAR
Generated
2026-10-06T21:17:26.751Z

Briefing on CALYPSO SOLAR

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
800 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2031-10-28
Proposed COD
C12
Queue phase
Briefing/projectactive

CALYPSO SOLAR is a 800 MW Solar+Battery project in California, currently active.

The reported queue phase is C12. Proposed COD is 2031-10-28.

Queue ID
CAISO-1636
Location
Riverside, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Colorado River Substation 230kV

What stands out

1

CALYPSO SOLAR is a 800 MW Solar+Battery project in California with status active.

2

The reported queue phase is C12; proposed COD is 2031-10-28.

Market and operating context

Queue date
2019-04-15
Proposed COD
2031-10-28
IA status
IA Executed
Study phase
C12
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

CALYPSO SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-1636
LocationRiverside, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionColorado River Substation 230kV
Queue date2019-04-15
Proposed COD2031-10-28
IA statusIA Executed