Query
Callahan Divide Wind Energy Center
Type
Entity Briefing
Entity
Callahan Divide Wind Energy Center
Technology
wind
Generated
2026-10-18T01:06:51.694Z

Briefing on Callahan Divide Wind Energy Center

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
114 MW
Capacity
Operating
Current status
2005
Operating since
1
Generators
41.4%
Capacity factor
414 GWh
Annual generation
Briefing/plantOperating

Callahan Divide Wind Energy Center is a 114 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.

Callahan Divide Wind Energy Center is reported in Texas since 2005 under NextEra Energy. Available operating and financial measures include 41.4% capacity factor and 414 GWh annual generation; $1895/kW reported CapEx.

Location
Taylor, Texas
Technology
Onshore Wind Turbine
Owner / parent
NextEra Energy
Operator
FPL Energy Callahan Wind, LLC
Grid
ERCOT (Texas)
Plant ID
56270

What stands out

1

Callahan Divide Wind Energy Center is a 114 MW Onshore Wind Turbine asset in Texas with status Operating.

2

Latest annual operating measures report 41.4% capacity factor and 414 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

4

Latest linked story: “Why I Can’t Stop Buying This Dividend Stock” (24/7 Wall St., 2026-05-25).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#202 of 252
National rank
#644 of 1,442

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.