Callahan Divide Wind Energy Center is a 114 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.
Callahan Divide Wind Energy Center is reported in Texas since 2005 under NextEra Energy. Available operating and financial measures include 41.4% capacity factor and 414 GWh annual generation; $1895/kW reported CapEx.
- Location
- Taylor, Texas
- Technology
- Onshore Wind Turbine
- Owner / parent
- NextEra Energy
- Operator
- FPL Energy Callahan Wind, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 56270
What stands out
Callahan Divide Wind Energy Center is a 114 MW Onshore Wind Turbine asset in Texas with status Operating.
Latest annual operating measures report 41.4% capacity factor and 414 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Latest linked story: “Why I Can’t Stop Buying This Dividend Stock” (24/7 Wall St., 2026-05-25).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #202 of 252
- National rank
- #644 of 1,442
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.