Briefing on Cairos Storage 2

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
184 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cairos Storage 2 is a 184 MW Battery project in Texas, currently active.

Cairos Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.

Queue ID
ERCOT-26INR0448
Location
Kinney, Texas
Technology
Battery
Developer
Cairos Solar, LLC
Market / region
ERCOT
Point of interconnection
7425 ODLAW SWITCH 138kV

What stands out

1

Cairos Storage 2 is a 184 MW Battery project in Texas with status active.

2

Cairos Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-31.

Market and operating context

Queue date
2024-07-01
Proposed COD
2028-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cairos Storage 2 — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0448
LocationKinney, Texas
TechnologyBattery
DeveloperCairos Solar, LLC
Market / regionERCOT
Point of interconnection7425 ODLAW SWITCH 138kV
Queue date2024-07-01
Proposed COD2028-12-31