Query
CADY SOLAR
Type
Entity Briefing
Entity
CADY SOLAR
Generated
2026-10-06T13:57:49.964Z

Briefing on CADY SOLAR

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
626 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2031-02-26
Proposed COD
C14
Queue phase
Briefing/projectactive

CADY SOLAR is a 626 MW Solar+Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2031-02-26.

Queue ID
CAISO-2103
Location
San Bernardino, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Pisgah Substation 230 kV

What stands out

1

CADY SOLAR is a 626 MW Solar+Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2031-02-26.

3

Latest linked story: “The first 'utility scale' renewable energy plant combining solar and wind generation with battery storage opens in the US” (Electrek, 2022-10-06).

Market and operating context

Queue date
2021-04-15
Proposed COD
2031-02-26
IA status
IA Executed
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

CADY SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-2103
LocationSan Bernardino, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionPisgah Substation 230 kV
Queue date2021-04-15
Proposed COD2031-02-26
IA statusIA Executed