Briefing/projectactive
CADY SOLAR is a 626 MW Solar+Battery project in California, currently active.
The reported queue phase is C14. Proposed COD is 2031-02-26.
- Queue ID
- CAISO-2103
- Location
- San Bernardino, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Pisgah Substation 230 kV
What stands out
1
CADY SOLAR is a 626 MW Solar+Battery project in California with status active.
2
The reported queue phase is C14; proposed COD is 2031-02-26.
3
Latest linked story: “The first 'utility scale' renewable energy plant combining solar and wind generation with battery storage opens in the US” (Electrek, 2022-10-06).
Market and operating context
- Queue date
- 2021-04-15
- Proposed COD
- 2031-02-26
- IA status
- IA Executed
- Study phase
- C14
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.