Query
Burr Oak Solar
Type
Entity Briefing
Entity
Burr Oak Solar
Generated
2026-10-12T00:54:31.157Z

Briefing on Burr Oak Solar

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
300 MW
Proposed capacity
active
Current status
Solar
Technology
PJM
Market / region
2023-12-29
Proposed COD
TC1
Queue phase
Briefing/projectactive

Burr Oak Solar is a 300 MW Solar project in Illinois, currently active.

Leeward Renewable Energy Development, LLC is the reported developer. The reported queue phase is TC1. Proposed COD is 2023-12-29.

Queue ID
PJM-AG1-118
Location
Dekalb, Illinois
Technology
Solar
Developer
Leeward Renewable Energy Development, LLC
Market / region
PJM
Point of interconnection
Sugar Grove-Waterman 138kV

What stands out

1

Burr Oak Solar is a 300 MW Solar project in Illinois with status active.

2

Leeward Renewable Energy Development, LLC is the reported developer.

3

The reported queue phase is TC1; proposed COD is 2023-12-29.

Market and operating context

Queue date
2020-08-31
Proposed COD
2023-12-29
IA status
Feasibility Study
Study phase
TC1
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Burr Oak Solar — verified asset snapshot

FieldValue
Queue IDPJM-AG1-118
LocationDekalb, Illinois
TechnologySolar
DeveloperLeeward Renewable Energy Development, LLC
Market / regionPJM
Point of interconnectionSugar Grove-Waterman 138kV
Queue date2020-08-31
Proposed COD2023-12-29