Burr Oak Solar is a 300 MW Solar project in Illinois, currently active.
Leeward Renewable Energy Development, LLC is the reported developer. The reported queue phase is TC1. Proposed COD is 2023-12-29.
- Queue ID
- PJM-AG1-118
- Location
- Dekalb, Illinois
- Technology
- Solar
- Developer
- Leeward Renewable Energy Development, LLC
- Market / region
- PJM
- Point of interconnection
- Sugar Grove-Waterman 138kV
What stands out
1
Burr Oak Solar is a 300 MW Solar project in Illinois with status active.
2
Leeward Renewable Energy Development, LLC is the reported developer.
3
The reported queue phase is TC1; proposed COD is 2023-12-29.
Market and operating context
- Queue date
- 2020-08-31
- Proposed COD
- 2023-12-29
- IA status
- Feasibility Study
- Study phase
- TC1
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.