Burr Oak Solar
300 MW generation in Dekalb, IL · In queue since August 2020 · Proposed COD December 2023
300 MW
Capacity
1
Components
Solar
5y 9m
In Queue
Feasibility Study
IA Phase
COD target: 2023
Total Duration
3y 4m
Schedule
29 months past proposed COD
Study Phase
TC1
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-29
PJM-AG1-118 is a proposed solar generation project with a total capacity of 300 MW. The project is located in Dekalb County, Illinois, within the ComEd service area and the PJM Interconnection region. It entered the PJM queue on August 31, 2020, and has a proposed commercial operation date of December 29, 2023. The project's interconnection status is currently in the Feasibility Study phase.
The proposed project consists of 300 MW of solar photovoltaic generation. It is interconnected at the Sugar Grove-Waterman 138kV point of interconnection. The developer is not specified in the queue data.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Dekalb
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Leeward Renewable Energy Development, LLC
Utility
ComEd
Entity
PJM
Service Type
NRIS
Point of Interconnection
Sugar Grove-Waterman 138kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Burr Oak SolarForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.