Burr Oak Solar (PJM-AG1-118) — Project Summary

Queue ID
PJM-AG1-118
Capacity
300 MW
Technology
Solar
Status
active
Location
Dekalb, IL
Region
PJM
Developer
Leeward Renewable Energy Development, LLC
IA Status
Feasibility Study

Burr Oak Solar

PJM-AG1-118BetaActiveSolarPJMLBNL

300 MW generation in Dekalb, IL · In queue since August 2020 · Proposed COD December 2023

BA: PJMISO/RTO: PJMNERC: RFCRC: MISO

300 MW

Capacity

1

Components

Solar

5y 9m

In Queue

Feasibility Study

IA Phase

COD target: 2023

Interconnection

Total Duration

3y 4m

Schedule

29 months past proposed COD

Study Phase

TC1

Feasibility Study13%
Queue EntryAug 31, 2020

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-12-29

About

PJM-AG1-118 is a proposed solar generation project with a total capacity of 300 MW. The project is located in Dekalb County, Illinois, within the ComEd service area and the PJM Interconnection region. It entered the PJM queue on August 31, 2020, and has a proposed commercial operation date of December 29, 2023. The project's interconnection status is currently in the Feasibility Study phase.

The proposed project consists of 300 MW of solar photovoltaic generation. It is interconnected at the Sugar Grove-Waterman 138kV point of interconnection. The developer is not specified in the queue data.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

Dekalb

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Leeward Renewable Energy Development, LLC

Utility

ComEd

Entity

PJM

Service Type

NRIS

Point of Interconnection

Sugar Grove-Waterman 138kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No Ask reports yet for this entity.

Ask about Burr Oak Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.