Burr Oak Solar
300 MW generation in Dekalb, IL · In queue since August 2020 · Proposed COD March 2030
300 MW
Capacity
1
Components
Solar
6y 3m
In Queue
Feasibility Study
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
9y 7m
Study Phase
TC1
Interconnection request submitted to ISO/RTO
EP; FINAL AGREEMENT; TC1
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-03-21
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
DeKalb County Board approved the special use permit for the roughly 2,000-acre Burr Oak Solar project on a split vote.
shawlocal.comResearch sources and reasoning (3 recorded sources)
medium confidence at research time
- shawlocal.com/daily-chronicle/2025/09/20/2k-acre-solar-facility-gets-dekalb-county-approval/
- wspynews.com/news/local/dekalb-county-board-approves-burr-oak-solar-farm/article_36d851db-fe48-4345-9ae2-e443024c1bea.html
- dekalbcounty.org/wp-content/uploads/2025/06/pubnotice-cd-07172025-burr-oak-solar.pdf
Commercial operation date: No news or press source gives a COD or construction schedule. The only date is the LBNL proposed COD of 2030-03-21, which fits a project that has just received its county permit and is still at Feasibility Study.
Developer: The DeKalb County public notice says 'Burr Oak Solar, LLC, a subsidiary of Leeward Renewable Energy' applied for the 300 MW project, which matches the LBNL filer. A Facebook group claims LRE has sold the project, but that is an unverified rumor and is not treated as an ownership change.
Status: LBNL lists the project as active and nothing in the search results suggests withdrawal. Local coverage shows it moving through permitting, with the county special use permit approved around Sept 17-20, 2025.
About
Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PJM-AG1-118 is a proposed solar generation project with a total capacity of 300 MW. The project is located in Dekalb County, Illinois, within the ComEd service area and the PJM Interconnection region. It entered the PJM queue on August 31, 2020, and has a proposed commercial operation date of December 29, 2023. The project's interconnection status is currently in the Feasibility Study phase.
The proposed project consists of 300 MW of solar photovoltaic generation. It is interconnected at the Sugar Grove-Waterman 138kV point of interconnection. The developer is not specified in the queue data.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Dekalb
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Leeward Renewable Energy Development, LLC
Utility
ComEd
Entity
PJM
Service Type
NRIS
Point of Interconnection
Sugar Grove-Waterman 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Illinois Solar in Illinois growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
OE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
OE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.