Briefing on Bulldog Power II

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
311 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2030-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Bulldog Power II is a 311 MW Gas project in Texas, currently active.

Bulldog Power II LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-09-30.

Queue ID
ERCOT-30INR0073
Location
Brazoria, Texas
Technology
Gas
Developer
Bulldog Power II LLC
Market / region
ERCOT
Point of interconnection
39703 TNMP FM524 Substation 138kV

What stands out

1

Bulldog Power II is a 311 MW Gas project in Texas with status active.

2

Bulldog Power II LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-09-30.

4

Latest linked story: “Entergy Texas issues RFP for new power generation to support Southeast Texas growth” (itemonline.com, 2026-03-09).

Market and operating context

Queue date
2025-12-16
Proposed COD
2030-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bulldog Power II — verified asset snapshot

FieldValue
Queue IDERCOT-30INR0073
LocationBrazoria, Texas
TechnologyGas
DeveloperBulldog Power II LLC
Market / regionERCOT
Point of interconnection39703 TNMP FM524 Substation 138kV
Queue date2025-12-16
Proposed COD2030-09-30