Bulldog Power II is a 311 MW Gas project in Texas, currently active.
Bulldog Power II LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-09-30.
- Queue ID
- ERCOT-30INR0073
- Location
- Brazoria, Texas
- Technology
- Gas
- Developer
- Bulldog Power II LLC
- Market / region
- ERCOT
- Point of interconnection
- 39703 TNMP FM524 Substation 138kV
What stands out
Bulldog Power II is a 311 MW Gas project in Texas with status active.
Bulldog Power II LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2030-09-30.
Latest linked story: “Entergy Texas issues RFP for new power generation to support Southeast Texas growth” (itemonline.com, 2026-03-09).
Market and operating context
- Queue date
- 2025-12-16
- Proposed COD
- 2030-09-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.