Bulldog Power II (ERCOT-30INR0073) — Project Summary

Queue ID
ERCOT-30INR0073
Capacity
311 MW
Technology
Gas
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Bulldog Power II LLC
IA Status
Facility Study

Bulldog Power II

ERCOT-30INR0073BetaActiveGasERCOTLBNL + Live

311 MW generation in Brazoria, TX · In queue since December 2025 · Proposed COD September 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

311 MW

Capacity

1

Components

Gas

11 months

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 9m

Facilities Study50%
Queue EntryDec 16, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-09-30

Queue history
30INR0073 · 10 monthly ERCOT reports, Dec 2025 – Sep 2026

Projected COD moved

0 times

Sep 2030 → Sep 2030

Net change

0 months

first report to latest

Capacity

311 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 16, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 30, 2030
From queue filing
Developer in saved assessment
Bulldog Power II LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage. No interconnection agreement, permit, construction or financing news found.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/natural-gas-power-plants/texas/30INR0073/bulldog-power-ii
  2. fieldprospects.com/developers/bulldog-power-ii-llc/
  3. interconnection.fyi/projects/state/TX
  4. wattstreet.net/county/tx/brazoria-county/

Commercial operation date: Only the LBNL/ERCOT filing gives a firm date (2030-09-30). The Cleanview aggregator snippet says the plant is 'expected to come online in September ...', which matches LBNL but is not independent. No developer press release or news article gives a different target.

Developer: Only the LBNL filing entity (Bulldog Power II LLC) is identified. FieldProspects lists the same LLC with a single 311 MW planned project. No source names a parent or operating company, and the Brazoria data center article does not tie the project to a sponsor.

Status: LBNL shows 'active' with a Facility Study IA status. Queue trackers (interconnection.fyi, Cleanview, WattStreet) also list it as active/planned. No contrary evidence was found.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Bulldog Power II is a proposed 311 MW gas-fired generation project located in Brazoria County, Texas. The project, utilizing gas combustion turbine technology, is being developed by Bulldog Power II LLC. It is listed in the ERCOT interconnection queue as entry ERCOT-30INR0073, with a queue entry date of December 16, 2025, and a proposed commercial operation date of September 30, 2030. The point of interconnection is the 39703 TNMP FM524 Substation at 138kV.

The Bulldog Power II project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Bulldog Power II LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

39703 TNMP FM524 Substation 138kV

Data Source

LBNL + Live

ApplicantEntergy Texasitemonline.com · 2026-03-09
AgencyPublic Utility Commission of Texasitemonline.com · 2026-03-09
RulingNoticeitemonline.com · 2026-03-09
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.