Briefing on BRP Triton BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
205 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Triton BESS is a 205 MW Battery project in Texas, currently active.

BRP Triton BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-01.

Queue ID
ERCOT-24INR0111
Location
Comanche, Texas
Technology
Battery
Developer
BRP Triton BESS LLC
Market / region
ERCOT
Point of interconnection
138 kV Comanche Switch Substation (#1441)

What stands out

1

BRP Triton BESS is a 205 MW Battery project in Texas with status active.

2

BRP Triton BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-12-01.

Market and operating context

Queue date
2021-10-18
Proposed COD
2026-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Triton BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0111
LocationComanche, Texas
TechnologyBattery
DeveloperBRP Triton BESS LLC
Market / regionERCOT
Point of interconnection138 kV Comanche Switch Substation (#1441)
Queue date2021-10-18
Proposed COD2026-12-01