BRP Rhine BESS is a 207 MW Battery project in Texas, currently active.
BRP Rhine BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-01.
- Queue ID
- ERCOT-23INR0075
- Location
- Ward, Texas
- Technology
- Battery
- Developer
- BRP Rhine BESS LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 11188 QUARRYFLD - 11010 WOLF
What stands out
1
BRP Rhine BESS is a 207 MW Battery project in Texas with status active.
2
BRP Rhine BESS LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-12-01.
Market and operating context
- Queue date
- 2020-08-04
- Proposed COD
- 2028-12-01
- IA status
- Facility Study
- Study phase
- Facility Study