Query
BRP Octans BESS
Type
Entity Briefing
Entity
BRP Octans BESS
State
TN
Technology
battery
Generated
2026-10-18T10:19:31.252Z

Briefing on BRP Octans BESS

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
130 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Octans BESS is a 130 MW Battery project in Texas, currently active.

BRP OCTANS BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.

Queue ID
ERCOT-22INR0386
Location
Pecos, Texas
Technology
Battery
Developer
BRP OCTANS BESS LLC
Market / region
ERCOT
Point of interconnection
6671 Tombstone 138kV

What stands out

1

BRP Octans BESS is a 130 MW Battery project in Texas with status active.

2

BRP OCTANS BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-12-01.

Market and operating context

Queue date
2020-07-24
Proposed COD
2029-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Octans BESS — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0386
LocationPecos, Texas
TechnologyBattery
DeveloperBRP OCTANS BESS LLC
Market / regionERCOT
Point of interconnection6671 Tombstone 138kV
Queue date2020-07-24
Proposed COD2029-12-01