Query
BRP Nile BESS
Type
Entity Briefing
Entity
BRP Nile BESS
State
TN
Technology
battery
Generated
2026-10-05T07:25:15.407Z

Briefing on BRP Nile BESS

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
202 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Nile BESS is a 202 MW Battery project in Texas, currently active.

BRP Nile BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.

Queue ID
ERCOT-23INR0275
Location
Webb, Texas
Technology
Battery
Developer
BRP Nile BESS LLC
Market / region
ERCOT
Point of interconnection
80220 Cenizo 345kV

What stands out

1

BRP Nile BESS is a 202 MW Battery project in Texas with status active.

2

BRP Nile BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-01.

Market and operating context

Queue date
2021-05-31
Proposed COD
2027-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Nile BESS — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0275
LocationWebb, Texas
TechnologyBattery
DeveloperBRP Nile BESS LLC
Market / regionERCOT
Point of interconnection80220 Cenizo 345kV
Queue date2021-05-31
Proposed COD2027-12-01