Briefing on BRP Musca BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Musca BESS is a 101 MW Battery project in Texas, currently active.

BRP Musca BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.

Queue ID
ERCOT-22INR0383
Location
Reagan, Texas
Technology
Battery
Developer
BRP Musca BESS LLC
Market / region
ERCOT
Point of interconnection
60361 Santa Rita 138kV

What stands out

1

BRP Musca BESS is a 101 MW Battery project in Texas with status active.

2

BRP Musca BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-01.

4

Latest linked story: “GridStor Announces Acquisition of Texas Battery Energy Storage Project From Balanced Rock Power” (Business Wire, 2025-02-03).

Market and operating context

Queue date
2020-07-24
Proposed COD
2027-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Musca BESS — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0383
LocationReagan, Texas
TechnologyBattery
DeveloperBRP Musca BESS LLC
Market / regionERCOT
Point of interconnection60361 Santa Rita 138kV
Queue date2020-07-24
Proposed COD2027-12-01