Query
Brookesmith Storage
Type
Entity Briefing
Entity
Brookesmith Storage
Generated
2026-10-19T04:40:04.611Z

Briefing on Brookesmith Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
351 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-05-07
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Brookesmith Storage is a 351 MW Battery project in Texas, currently active.

Brookesmith Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-05-07.

Queue ID
ERCOT-28INR0166
Location
Brown, Texas
Technology
Battery
Developer
Brookesmith Storage LLC
Market / region
ERCOT
Point of interconnection
Tap Brown Switch #1444 – Russell Gap Switch #3348

What stands out

1

Brookesmith Storage is a 351 MW Battery project in Texas with status active.

2

Brookesmith Storage LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-05-07.

Market and operating context

Queue date
2025-04-01
Proposed COD
2029-05-07
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Brookesmith Storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0166
LocationBrown, Texas
TechnologyBattery
DeveloperBrookesmith Storage LLC
Market / regionERCOT
Point of interconnectionTap Brown Switch #1444 – Russell Gap Switch #3348
Queue date2025-04-01
Proposed COD2029-05-07