Briefing/projectactive
BOULDER BRUSH HYBRID is a 420 MW Wind+Battery project in California, currently active.
The reported queue phase is C14. Proposed COD is 2031-02-05.
- Queue ID
- CAISO-2177
- Location
- San Diego, California
- Technology
- Wind+Battery
- Market / region
- CAISO
- Point of interconnection
- Suncrest - Ocotillo 500 kV Line
What stands out
1
BOULDER BRUSH HYBRID is a 420 MW Wind+Battery project in California with status active.
2
The reported queue phase is C14; proposed COD is 2031-02-05.
Market and operating context
- Queue date
- 2021-04-15
- Proposed COD
- 2031-02-05
- IA status
- System Impact Study
- Study phase
- C14
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.