Briefing/projectactive
Bottom Grass Solar II is a 402 MW Solar+Battery project in Texas, currently active.
Flint Rock Solar Project, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-03-01.
- Queue ID
- ERCOT-25INR0152
- Location
- Colorado, Texas
- Technology
- Solar+Battery
- Developer
- Flint Rock Solar Project, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 9073 Holman - 44200 Hillje
What stands out
1
Bottom Grass Solar II is a 402 MW Solar+Battery project in Texas with status active.
2
Flint Rock Solar Project, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-03-01.
Market and operating context
- Queue date
- 2022-11-07
- Proposed COD
- 2028-03-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.