Briefing on Bottom Grass Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
509 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-03-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Bottom Grass Solar is a 509 MW Solar+Battery project in Texas, currently active.

Bottom Grass Solar Project, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-03-01.

Queue ID
ERCOT-23INR0082
Location
Colorado, Texas
Technology
Solar+Battery
Developer
Bottom Grass Solar Project, LLC
Market / region
ERCOT
Point of interconnection
tap 345 kV 9073 Holman - 44200 Hillje

What stands out

1

Bottom Grass Solar is a 509 MW Solar+Battery project in Texas with status active.

2

Bottom Grass Solar Project, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-03-01.

4

Latest linked story: “H&M Group signs virtual power purchase agreement with Lightsource bp – enabling the construction of new, renewable energy infrastructure in Texas” (H&M Group, 2024-10-31).

Market and operating context

Queue date
2020-11-05
Proposed COD
2028-03-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bottom Grass Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0082
LocationColorado, Texas
TechnologySolar+Battery
DeveloperBottom Grass Solar Project, LLC
Market / regionERCOT
Point of interconnectiontap 345 kV 9073 Holman - 44200 Hillje
Queue date2020-11-05
Proposed COD2028-03-01