Bottom Grass Solar is a 509 MW Solar+Battery project in Texas, currently active.
Bottom Grass Solar Project, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-03-01.
- Queue ID
- ERCOT-23INR0082
- Location
- Colorado, Texas
- Technology
- Solar+Battery
- Developer
- Bottom Grass Solar Project, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345 kV 9073 Holman - 44200 Hillje
What stands out
Bottom Grass Solar is a 509 MW Solar+Battery project in Texas with status active.
Bottom Grass Solar Project, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2028-03-01.
Latest linked story: “H&M Group signs virtual power purchase agreement with Lightsource bp – enabling the construction of new, renewable energy infrastructure in Texas” (H&M Group, 2024-10-31).
Market and operating context
- Queue date
- 2020-11-05
- Proposed COD
- 2028-03-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.