Query
Bonham Storage SLF
Type
Entity Briefing
Entity
Bonham Storage SLF
Generated
2026-10-19T13:38:54.586Z

Briefing on Bonham Storage SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
105 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Bonham Storage SLF is a 105 MW Solar+Battery project in Texas, currently active.

J&J Solar Ranch LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-07-01.

Queue ID
ERCOT-26INR0619
Location
Limestone, Texas
Technology
Solar+Battery
Developer
J&J Solar Ranch LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 3632 Mexia_Main - 3634 Groesbeck_Main

What stands out

1

Bonham Storage SLF is a 105 MW Solar+Battery project in Texas with status active.

2

J&J Solar Ranch LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-07-01.

Market and operating context

Queue date
2025-01-28
Proposed COD
2027-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bonham Storage SLF — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0619
LocationLimestone, Texas
TechnologySolar+Battery
DeveloperJ&J Solar Ranch LLC
Market / regionERCOT
Point of interconnectionTap 138kV 3632 Mexia_Main - 3634 Groesbeck_Main
Queue date2025-01-28
Proposed COD2027-07-01