Query
Bonham Solar SLF
Type
Entity Briefing
Entity
Bonham Solar SLF
Generated
2026-10-19T06:43:59.533Z

Briefing on Bonham Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
138 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-04-06
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Bonham Solar SLF is a 138 MW Solar+Battery project in Texas, currently active.

J&J Solar Ranch LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-04-06.

Queue ID
ERCOT-25INR0199
Location
Limestone, Texas
Technology
Solar+Battery
Developer
J&J Solar Ranch LLC
Market / region
ERCOT
Point of interconnection
TAP 138 kV MEXIA_2_1_8 3632 - GROES_SE1_8 3634

What stands out

1

Bonham Solar SLF is a 138 MW Solar+Battery project in Texas with status active.

2

J&J Solar Ranch LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-04-06.

Market and operating context

Queue date
2022-11-15
Proposed COD
2027-04-06
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bonham Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0199
LocationLimestone, Texas
TechnologySolar+Battery
DeveloperJ&J Solar Ranch LLC
Market / regionERCOT
Point of interconnectionTAP 138 kV MEXIA_2_1_8 3632 - GROES_SE1_8 3634
Queue date2022-11-15
Proposed COD2027-04-06