Briefing on Bonaparte BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
154 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-29
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Bonaparte BESS is a 154 MW Battery project in Texas, currently active.

Bonaparte BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-29.

Queue ID
ERCOT-26INR0283
Location
Lee, Texas
Technology
Battery
Developer
Bonaparte BESS, LLC
Market / region
ERCOT
Point of interconnection
7568 Lincoln 138 kV

What stands out

1

Bonaparte BESS is a 154 MW Battery project in Texas with status active.

2

Bonaparte BESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-29.

Market and operating context

Queue date
2023-11-14
Proposed COD
2027-12-29
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bonaparte BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0283
LocationLee, Texas
TechnologyBattery
DeveloperBonaparte BESS, LLC
Market / regionERCOT
Point of interconnection7568 Lincoln 138 kV
Queue date2023-11-14
Proposed COD2027-12-29