Query
BONANZA SOLAR growth signals — PPAs, construction, new projects
Type
Entity Briefing
Entity
BONANZA PEAK SOLAR FARM
ISO/RTO
isone
Technology
solar
Generated
2026-10-14T01:43:09.999Z

Briefing on BONANZA PEAK SOLAR FARM

Entity Briefing
Generated Oct 14, 2026·Dataset freshness not reported
641 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2027-12-31
Proposed COD
C12
Queue phase
Briefing/projectactive

BONANZA PEAK SOLAR FARM is a 641 MW Solar+Battery project in Nevada, currently active.

The reported queue phase is C12. Proposed COD is 2027-12-31.

Queue ID
CAISO-1655
Location
Clark, Nevada
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Trout Canyon Substation 230 kV

What stands out

1

BONANZA PEAK SOLAR FARM is a 641 MW Solar+Battery project in Nevada with status active.

2

The reported queue phase is C12; proposed COD is 2027-12-31.

3

Latest linked story: “EDFR NA Signs PPA with SCPPA for Solar and Storage Energy Project in US” (Energetica India Magazine, 2024-02-28).

Market and operating context

Queue date
2019-04-12
Proposed COD
2027-12-31
IA status
IA Executed
Study phase
C12
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BONANZA PEAK SOLAR FARM — verified asset snapshot

FieldValue
Queue IDCAISO-1655
LocationClark, Nevada
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionTrout Canyon Substation 230 kV
Queue date2019-04-12
Proposed COD2027-12-31
IA statusIA Executed